Friday, 14 March 2014
Thursday, 9 January 2014
Thursday, 2 January 2014
Thursday, 26 December 2013
Holiday List 2014
ANNEXURE - I
HOLIDAYS 2014
Sl.
No.
|
Occasion
|
Date Chrisitan
Era
|
Date Slika Era
|
Day of the week
|
1.
|
*Milad-Un-Nabi or Id-E-Milad
(Birthday of Prophet Mohammed)
|
January 14
|
Pausa 24
|
Tuesday
|
2.
|
Republic day
|
January 26
|
Magha 06
|
Sunday
|
3.
|
Mahashivarathri
|
February 27
|
Phalguna 08
|
Thursday
|
4.
|
Mahavir Jayanti
|
April 13
|
Chaitra 23
|
Sunday
|
5.
|
Good Friday
|
April 18
|
Chaitra 28
|
Friday
|
6.
|
Buddha Purnima
|
May 14
|
Vaisakha 24
|
Wednesday
|
7.
|
*Idu’l Fitr(Ramzan)
|
July 29
|
Sravana 07
|
Tuesday
|
8.
|
Independence Day
|
August 15
|
Sravana 24
|
Friday
|
9.
|
Janmashtami
|
August 18
|
Sravana 27
|
Monday
|
10.
|
Vinayaka Chaturthi
|
August 29
|
Bhadra 07
|
Friday
|
11.
|
Mahatma Gandhi’s Birthday
|
October 02
|
Asvina 10
|
Thursday
|
12.
|
Dussehra
|
October 03
|
Asvina 11
|
Friday
|
13.
|
*Idu’l Zuha (Bakrid)
|
October 06
|
Asvina 14
|
Monday
|
14.
|
Diwali(Deepavali)
|
October 22
|
Asvina 30
|
Wednesday
|
15.
|
*Muharram
|
November 04
|
Karthika 13
|
Tuesday
|
16.
|
Guru Nanak’s Birthday
|
November 06
|
Karthika 15
|
Thursday
|
17.
|
Christmas Day
|
December 25
|
Pausa 04
|
Thursday
|
*Subject
to change depending on the sighting of the moon.
The date for the four holidays of Birthday of Prophet
Mohammed (Jan 14),Idu’l Fitr(Ramza- July 29), Idu’l Zuha(Bakrdi Oct 06) and
Muharram (Nov0 4) have been adopted from
the Central List. If the State
Government changes any of these holidays, the changed date only will be
observed as a Closed Holiday for Central Government Offices also. But, if the Stae Government sanctions any
additional Holiday(s) in connection with the above occasions, the date of such
additional holiday(s) will be observed as Restricted Holiday(s) only for
Central Government Offices. If the
change of date of any of the above occasions
is notified at very short notice, announcement through TV/AIR/News Paper can be
taken as authority for such change.
Endt No. L/HOLIDAYS/2014 DATED AT
TIRUR 676 104 THE 23.12.2013
Copy
to:- 1.
All Offices under Tirur Division for information.
2.
All Inspecting officers under Tirur Division
3. All Staff in Divisional Office.
4.
File
Monday, 9 December 2013
Roll out of network Integration Project under IT Modernization 2012
DEPARTMENT OF POSTS, INDIA
Office of the Superintendent of Post Offices,
Tirur Division Tirur 676 104
To
All Departmental offices
Under Tirur Division
No. Tech/WAN/Sify
Dated at Tirur 4 the
03.12.2013
Sub: Roll out of network Integration Project under
IT Modernization 2012
Ref: This office letter dated 09.04.2013 and
15.05.13
This is continuation of this office letter dated 09.04.13 and
15.05.2013. Circle Office intimated this office that Sify will supply network
equipments to all offices immediately.
The project is divided into two phases. Kerala Circle comes under second
phase. Sify technologies will,
1. Erecting antenna
2. Supply network devices along with their enclosures
3. Extend the electrical power and earth these network devices
4. Commissioning of of BSNL and Sify network
5. Decommissioning of existing Wan and BSNL Broad band network
In order to facilitate the migration the following activity needs to be
carried out in each post office
1. A Suitable place for fixing the rack and switch needs to
be identified.
2. Arrange proper earthing to the rack power supply (not greater than 3
volt)
3. UPS power supply provision needs to arranged for the locations
identified for fixing the rack.
4. PM /SPM of the office should receive and keep the network devices
shipped by M/S Sify under safe custody and be handed over to the Sify
technician when he visits the office for installation. The boxes should not be
opened. The unpacking will be done by Sify persons.
5. PM/SPM of the office should check quantity of hardware, serial number of
router, Switches, racks and other information, on opening of the box by the
sify persons.
6. In charge of the office to check whether all applications are working
satisfactorily in the new network.
7.Officer in charge to provide sign off in 4 copies to Post offices,
Regional office, PMU and Sify.
8.The devices are going to be delivered through Express parcel of DOP. The
delivery may updated through Speednet.
9.An activity check list and basic reference sheet on NI migration is
enclosed for ready reference.
Superintendent
Wednesday, 20 November 2013
Tuesday, 8 October 2013
Subscribe to:
Posts (Atom)