Thursday, 26 December 2013

Holiday List 2014

ANNEXURE -  I
HOLIDAYS  2014
   Sl.
  No.
Occasion
Date Chrisitan
Era
Date Slika Era
Day of the week
1.        
*Milad-Un-Nabi or Id-E-Milad
(Birthday of Prophet Mohammed)
January        14
Pausa        24
Tuesday
2.        
Republic day
January        26
Magha        06
Sunday
3.        
Mahashivarathri
February     27
Phalguna   08
Thursday
4.        
Mahavir Jayanti
April            13
Chaitra     23
Sunday
5.        
Good Friday
April            18
Chaitra     28
Friday
6.        
Buddha Purnima
May              14
Vaisakha  24
Wednesday
7.        
*Idu’l Fitr(Ramzan)
July               29
Sravana     07
Tuesday
8.        
Independence Day
August         15
Sravana     24
Friday
9.        
Janmashtami
August         18
Sravana     27
Monday
10.     
Vinayaka Chaturthi
August         29
Bhadra      07
Friday
11.     
Mahatma Gandhi’s Birthday
October      02
Asvina       10
Thursday
12.     
Dussehra
October       03
Asvina       11
Friday
13.     
*Idu’l  Zuha (Bakrid)
October       06
Asvina       14
Monday
14.     
Diwali(Deepavali)
October       22
Asvina       30
Wednesday
15.     
*Muharram
November   04
Karthika    13
Tuesday
16.     
Guru Nanak’s Birthday
November   06
Karthika     15
Thursday
17.     
Christmas Day
December   25
Pausa          04
Thursday
                *Subject to change depending on the sighting of the moon.
                The date for the four holidays of Birthday of Prophet Mohammed (Jan 14),Idu’l Fitr(Ramza- July 29), Idu’l Zuha(Bakrdi Oct 06) and Muharram (Nov0 4)  have been adopted from the Central List.  If the State Government changes any of these holidays, the changed date only will be observed as a Closed Holiday for Central Government Offices also.  But, if the Stae Government sanctions any additional Holiday(s) in connection with the above occasions, the date of such additional holiday(s) will be observed as Restricted Holiday(s) only for Central Government Offices.  If the change of date of any of the  above occasions is notified at very short notice, announcement through TV/AIR/News Paper can be taken as authority for such change.
Endt No. L/HOLIDAYS/2014              DATED AT   TIRUR  676  104            THE 23.12.2013
Copy to:-  1.   All Offices under Tirur Division for information.
                      2.   All Inspecting officers under Tirur Division
                   3.   All Staff in Divisional Office.
                      4.   File

Monday, 9 December 2013

Roll out of network Integration Project under IT Modernization 2012

     DEPARTMENT OF POSTS, INDIA
       Office of the Superintendent of Post Offices,     
                                                             Tirur Division Tirur 676 104

To
All Departmental offices
Under Tirur Division

No. Tech/WAN/Sify                 Dated at Tirur 4                                          the 03.12.2013

Sub: Roll out of network Integration Project under IT Modernization 2012
Ref: This office letter dated 09.04.2013 and 15.05.13

                                       This is continuation of this office letter dated 09.04.13 and 15.05.2013. Circle Office intimated this office that Sify will supply network equipments to all offices immediately.

The project is divided into two phases. Kerala Circle comes under second phase. Sify technologies will,

1. Erecting antenna
2. Supply network devices along with their enclosures
3. Extend the electrical power and earth these network devices
4. Commissioning of of BSNL and Sify network
5. Decommissioning of existing Wan and BSNL Broad band network

In order to facilitate the migration the following activity needs to be carried out in each post office

1. A Suitable place for fixing the rack and switch needs to be identified.
2. Arrange proper earthing to the rack power supply (not greater than 3 volt)
3. UPS power supply provision needs to arranged for the locations identified for fixing the rack.
4. PM /SPM of the office should receive and keep the network devices shipped by M/S Sify under safe custody and be handed over to the Sify technician when he visits the office for installation. The boxes should not be opened. The unpacking will be done by Sify persons.
5. PM/SPM of the office should check quantity of hardware, serial number of router, Switches, racks and other information, on opening of the box by the sify persons.
6. In charge of the office to check whether all applications are working satisfactorily in the new network.
7.Officer in charge to provide sign off in 4 copies to Post offices, Regional office, PMU and Sify.
8.The devices are going to be delivered through Express parcel of DOP. The delivery may updated through Speednet.
9.An activity check list and basic reference sheet on NI migration is enclosed for ready reference.

 Superintendent





Wednesday, 20 November 2013